All posts
Lead Tracking

Window Lead Tracking: Replacement Signs, Measurements, and Follow-Up

June 29, 2026 · 4 min read

The exact fields window reps need to capture at the door so consultations are productive and quotes close faster.

Replacement indicators

  • Condensation between panes
  • Drafts or difficulty opening/closing
  • Frame rot or warping
  • Single-pane or old aluminum frames
  • Recent energy bill spike

Fields that matter

  • Window count and locations
  • Story height (labor and ladder cost)
  • Frame material and condition
  • Style preference (double-hung, casement, slider, bay)
  • Color and grid pattern
  • Decision maker and spouse involvement
  • Financing interest
  • Photos of problem windows

Follow-up timing

  1. Inspection done → quote within 48 hours
  2. Quote sent → 3-day callback
  3. Spouse not present → schedule joint visit
  4. Timing objection → seasonal urgency (winter draft, summer cooling)

Territoryly's window template keeps every measurement and photo attached to the lead for the consultation team.

Map every door, sketch every job, and follow up every lead with Territoryly.