All posts
Lead Tracking

Gutter Lead Tracking Fields Every Rep Should Capture

June 19, 2026 · 4 min read

The exact data points gutter reps should log at every door to close more inspections and installs.

The inspection log

  • Linear footage (measure while inspecting)
  • Story height (affects labor and ladder needs)
  • Material type and color
  • Downspout count and drainage direction
  • Gutter guard interest (upsell)
  • Roof condition notes
  • Photos of sagging, clogs, and missing fasteners

Follow-up timing

  1. Inspection same day or next day
  2. Quote within 24 hours
  3. 48-hour callback after quote
  4. Weekly check-in if decision is delayed
  5. Seasonal re-knock before heavy rain season

Territoryly's gutter template has these fields built in so you never miss a detail that costs a deal.

Map every door, sketch every job, and follow up every lead with Territoryly.